16, the electrode, the welding flux should match the pipe, the grade must have a clear basis of information, product certification, and the effective use period. Welding, flux before using the instructions provided its products should be dried and kept dry during use, for use in the same day. Electrode Coating should be no loss and significant cracks.
17, a pump station pipe welding should butt welding. Before welding groove and its vicinity should be 10 ~ 20mm wide at the surface dirt, traces of oil, water and rust, etc. cleaned.
18, welded pipe and flange should butt welding flange, non-use plug-in flange.
19, welded pipe and butt-welded joints should be used, not be used in the form of plug-in.
20, welded pipes and pipe should butt welding, soldering not allowed to use the plug-in form.
21, when the hydraulic pipes butt welding, weld must be higher than the inner wall of the pipe 0.3 ~ 0.5mm. Recessed wall phenomenon is not allowed. After the solder, and then filing or hand wheel the inner wall above the weld repair level. Removing welding slag, burrs, to achieve a smooth level.
22, butt weld pipe cross-section should be perpendicular to the centerline.
23, the weld cross section is not allowed in the corner, it should also be avoided between two elbow pipe.
24, welding pipe, you must press the installation location spot welding position, then remove to welding, the welding assembly after shaping.
25, welding the whole process, should prevent wind, rain, snow invasion. After the pipe welding, the wall thickness of less than or equal to 5mm weld, should be cooled at room temperature, not use strong wind or water spray forced cooling.
26, the weld penetration should be, should be uniform smooth appearance. Weld pressure pipeline testing and inspection should be sampled.
27, conduit pipe welding after all pipes are pre-installed location should once. Each hydraulic components, valve block, valve frame, pumping stations connected. Each interface should be a natural fit and, for the connection is not strong twist. When you release the fittings or flange screws, the relative binding surface centerline not allowed to have a larger displacement, from the angle of the seam or Rocker. In such event available roasted shaping eliminated.
28, can be completed after all the pipe weld pipe clamps and racks can also be carried out according to the needs of post *.
29, conduit piping, welding, after the pre-installation, re-open the pickling phosphating. After the acid phosphate by pipeline to pass into the hot air pipe for quick drying. After drying, as in a few days to re-loaded into the system, which leads to the inner tube of hydraulic oil, usually do not make anti-rust treatment, but should be kept properly. As to be shelved indefinitely, you need anti-rust coating paint, it must handle the 48 hours before painting after phosphating. It should be noted, anti-rust coating must be compatible with the cleaning solution or pipe cleaning after use of hydraulic oil.
30, before the pipeline in acid, phosphate, install it again after drying, the need for each of the pipe wall to conduct a pre-cleaning. After the pre-cleaning is completed as soon as possible to re-install the system, the system's overall circulation purification, until the required cleanliness level system design.
31, Hose limited to the following situations: ---- ---- equipment between the movable element to facilitate the replacement of the replacement parts
---- Mechanical vibration or noise suppression at delivery
32, hose installation must be careful not to cause the drug to make hoses and fittings additional force, twisting, sharp bending, friction and other adverse conditions.
33, the hose before loading system, should also be cleaned cavity and joints.
Double variable vane pump works, pump manufacturers Which is better? Hydraulic gold is your good choice!
Double variable vane pump works:
1. The stator (lumen type line): 1) two long radius arc 2) two short radius arc 3) four transition curve